NEW CONSTRUCTION


VALUE:
$10,400,000
DURATION: 14 MONTHS
CLIENT: DIOCESE OF ROCKVILLE CENTER

  • New three story, 45,000sf Grammar School with a 27ft. deep underground gym
  • Propped along Northern Blvd. creating difficulty with sheeting, excavation and pouring concrete
  • New school completed in 14 months including renovation in classrooms of existing school
  • Work continued through a very harsh winter and required working some nights and all Saturdays to complete work for the new school year in September
  • All work was performed while school was in operation and required a lot of coordination


VALUE:
$5,900,000.00
DURATION: 10 MONTHS
CLIENT: CENTRAL AVENUE NISSAN

  • Built a new 46,000 sf concrete/steel framed two story showroom building with office/lobby/lounge space along with an elevator and an exposed underground parking lot
  • Built on a steep incline and on a water reservoir site making work conditions very difficult
  • Excavated through heavy rock and stone, which was later used in the building process
  • Detention tanks were installed under foundation to control water flow
  • In addition, a 16,500 sf steel/concrete framed service building was built with prefabricated exterior panels and all necessary work equipment